JEE Main | 2014Work, Power and EnergyHard
Question
When a rubber-band is stretched by a distance x, it exerts a restoring force of magnitude F = ax + bx2 where a and b are constants. The work done in stretching the unstretched rubber-band by L is :
Options
A.aL2 + bL3
B.
(aL2 + bL3)
(aL2 + bL3)C.

D.

Solution
∫dW = ∫F. dl
W = ∫0L ax dx + ∫0Lbx2dx =
W = ∫0L ax dx + ∫0Lbx2dx =

Create a free account to view solution
View Solution FreeMore Work, Power and Energy Questions
A body of mass is slowly halved up the rough hill by a force F at which each point is directed along a tangent to the hi...The work done in pulling up a block of wood weighing 2kN through a distance length of 10 m on a smooth plane inclined at...The potential energy of a particle in a force field is: , where A and B are positive constantsand r is the distance of p...The upper half of an inclined plane with inclinations perfectly smooth while the lower half is rough. A body starting fr...The force acting on a 4gm mass in the potential field U = 8x2 at x = − 2cm is :...